Three House Pictures
June 28, 2007
Jeff Guill and I completed the finish out on the intercom system this week. There are a total of eleven room stations, two door stations and a patio station, plus the master.
More carpentry work has been completed on the study fireplace.
The tile backspash is installed in the master bath.
h