Three House Pictures
October 24, 2006
The floor has been compacted and floor drains installed for the pole barn. Radiant heat lines need to be added before the floor can be poured. The indented areas in the picture are footings for a future vehicle hoist.
Duct work has been run in the basement hallway.
The dormer replacement project is almost complete.